Reference output
Tease:What a good run of Prompt A looks like, and what one lazy run looked like.Lede:These files were made on 2026-11-19 by following Prompt A as written againstsample/tickets.csv. They pass every check in../TEST.md.Why it matters:If a live run fails, show these.build.pyalso works as a no-AI fallback.Go deeper:Answer key · prompts
| File | What it is |
|---|---|
profile.md, brief.md | The profile step and the four-line brief |
build.py | Computes every number and writes the page. python3 expected/build.py sample/tickets.csv output/dashboard.html |
dashboard.html, definitions.md | Written by build.py |
dashboard.png, dashboard-phone.png | The page at 1440 and 390 pixels wide |
before/dashboard.png, before/dashboard-phone.png | The earlier layout, kept for comparison. The numbers were the same; the page did not say what to do. See ../UX-REVIEW.md. |
cheap-run.png, cheap-run-phone.png | One real run of Prompt A on a low-cost model (Claude Haiku, 2026-11-19), unedited. It passed every check in ../check.ts. It used year-first dates and taller phone rows; Prompt A now asks for both to be fixed, and that wording has not been run again. |
weekly-report.md | Seven bullets, numbers copied from the script's printout |
lazy-dashboard.html, lazy-dashboard.png | One real run of the lazy prompt on Gemini 3.8 Flash (Low) in the Antigravity CLI, 2026-11-19, unedited. Headline says 25 open items (it counted 3 notes; the right answer is 22), lists the duplicate T-1033 twice, and dumps all 56 rows. |
lazy-dashboard-haiku.html, lazy-dashboard-haiku.png | An earlier lazy run on Claude Haiku: 22 open was right, but it silently changed "Reveiw" to Review (Review bar 10, not 9). |
What the lazy run got wrong
It is a tidy page, and its open-ticket count (22) is right. Counted against the list in ../README.md:
- No question. Six cards of equal weight, and "open" is one of them.
- It changed "Reveiw" to "Review" on its own, so Review reads 10. The file says 9, plus 1 unmapped.
- The top line says "55 unique rows". The file has 56.
- The date is typed into its script, so it will be wrong for next week's export.
- The Done bar (30) sets the scale, so the four stages that matter are short.
- Five colors, and every title is a label ("Pipeline by stage").
- A table of all 22 open tickets and a second table by owner, so the page scrolls.
- The weekly chart compares a part week (W47) with full weeks.
- No definitions and no comparison with last week.
Another run, or another model, will make different mistakes.